Projects
Streets & Bridges
City of Houston, TX
Buffalo Speedway Reconstruction
Broadway Street Reconstruction
Hillcroft Avenue Reconstruction
Neighborhood Streets Reconstruction
Program
Texas Department of Transportation
US 90A Expansion — Dulles Avenue and Oyster Creek Bridges, Fort Bend County
IH 10/IH 410 Interchange Bridges, San Antonio
Harris County Toll Road Authority | Houston, TX
Grand Parkway Segment — Louetta Road Bridge
South Sam Houston Tollway Widening —
Section 2Beltway 8 East — Garners Bayou and John Ralston Road Bridges
Westpark Tollway at IH 610/US 59
Interchange Bridges
NOrth Texas Tollway Authority
North Dallas Tollway Extension — SH 121
Bridge, Frisco
Case Study
Westpark Tollway at IH 610 / US 59 Interchange
Nathelyne A. Kennedy & Associates was part of the three-firm team responsible for designing the reconfiguration of one of the nation’s top 10 most heavily congested intersections. The redesign called for overall improvements as well as modifications to allow connection with the new Westpark Tollway.
Of the total project scope — nine new bridges and reconstruction of two connectors — we were responsible for eight of the bridges and Connector C, which runs from US 59 onto northbound IH 610 and required curved steel girder design. Traffic control and drilled shaft retaining walls were also included in our firm’s scope of work. To assure project continuity, we coordinated with teams on adjacent projects and multiple regulatory authorities on design studies, roadway controls and storm drainage. The $32 million project was completed under a highly aggressive schedule.
Mass Transit
Metropolitan Transit Authority of Harris County | Houston, TX
Red Line Light Rail Program Management
Houston Light Rail Program Phase 2
- University Line
- Southeast Line
- North Line
- Uptown LineHouston Commuter Rail Project along IH 45
Southeast Houston Transit Center
US 59 N HOV Ramps at Townsend Park & Ride
Public Works
City of Houston, TX
Almeda Road and Holcombe Blvd 48-inch Water Line
Sims Bayou Relief Sewer Design
Antoine Drive to Tidwell Road 54-inch Water Line
Northshore Lift Station Design
Bennington Subdivision 4- to 12-inch Water Line
Dolly Wright Road Water Line (traffic control plan)
Bellaire Boulevard Widening (sanitary sewer/water line relocation)
Aviation
William P. Hobby Airport, Houston, Texas
Terminal Expansion and New Concourses
Concourse Apron Modification
Runway 12R-30L Rehabilitation
George Bush Intercontinental Airport, Houston, Texas
New Air Cargo Infrastructure
Continental Airlines Apron
Runway 8-26 Taxiway Rehabilitation
Taxiway CC Expansion
Austin-Bergstrom International Airport, Austin, Texas
Tango and Golf Taxiways
Terminal Access Road (SH 71 at
Presidential Blvd)
Other
Prairie View A&M University | Prairie View, Texas
Campus Master Plan Update
Sports Complex Master Plan
Port of Houston Authority, Houston, Texas
Bayport Terminal Master Plan
Bayport Container Terminal, Phase 1A Program Management
Bayport Terminal Complex, Phase 1 Container Yard Design
Barbours Cut Terminal Expansion, Heavy Rail Track Design
Wharf No. 33 Backland Development and Heavy Rail Track Design
Harris County-Houston Sports Authority, Houston, Texas
Minute Maid Park
Toyota Center
Reliant Stadium